Power supply disconnect, Dryer installation – Grain Systems PNEG-1707 User Manual

Page 20

Advertising
background image

4. Dryer Installation

20

PNEG-1707 TM-Series Tower Dryer

Power Supply Disconnect

All dryers are equipped with a power disconnect switch in the power box to permit total power shut down
before opening the power box door, as required for inspection and service. The power disconnect switch
is located on the power box door for quick shut down. See table on electrical requirements

below

for

sizing the electrical service to the dryer.

Electrical Requirements

Dryer Model

Voltage

Motor

HP

Motor Full

Load Amps

Dryer Full

Load Amps

1/

Main Breaker

and Service

(Amps)

TM-1008

230V

3 Phase

Fan

40

94

141

200

Metering System

1 - DC

5

Unload Auger

3

8.4

Auxiliary (1)

10

28

460V

3 Phase

Fan

40

47

76

150

Metering System

1 - DC

5

Unload Auger

3

4.2

Auxiliary (1)

10

14

TM-1010

230V

3 Phase

Fan

50

118

165

300

Metering System

1 - DC

5

Unload Auger

3

8.4

Auxiliary (1)

10

28

460V

3 Phase

Fan

50

59

88

200

Metering System

1 - DC

5

Unload Auger

3

4.2

Auxiliary (1)

10

14

TM-1012

230V

3 Phase

Fan

60

140

187

300

Metering System

1 - DC

5

Unload Auger

3

8.4

Auxiliary (1)

10

28

460V

3 Phase

Fan

60

70

99

200

Metering System

1 - DC

5

Unload Auger

3

4.2

Auxiliary (1)

10

14

TM-1015

230V

3 Phase

Fan

75

172

219

400

Metering System

1 - DC

5

Unload Auger

3

8.4

Auxiliary (1)

10

28

460V

3 Phase

Fan

75

86

115

200

Metering System

1 - DC

5

Unload Auger

3

4.2

Auxiliary (1)

10

14

1/

Assumes a 10 HP auxiliary load.

Advertising