10. Service

PNEG-1707 TM-Series Tower Dryer

51

Pre-season Service Check List

___ Lubricate blower motor bearings, if needed.

___ Clean burner ports.

___ Inspect flame rod and spark ignitor.

___ Inspect divider hopper between heat and cooling section. Clean if necessary.

___ Inspect bindicator grain level switches.

___ Check gas pressure gauges.

___ Clean control and power panels, tighten loose connections, and check for leaks.

___ Inspect metering systems. Clean accumulated stalks and old grain.

___ Start-up dryer and check operating controls.

___ Other: Itemize ___________________________________________________________

End of Season Shut Down Procedure

___ Start unload and empty all grain from dryers.

___ Clean out grain cushion (on plenum roof under fill spout). Clean plenum roof.

___ Clean off grain exchangers.

___ Clean out divider hopper, between heating and cooling section.

___ Clean inside cooling sheets and cooling floor.

___ Remove all grain and trash from unload section of dryer.

___ Open emergency grain discharge doors.

___ Open drain valve in gas train.

___ Cover burner with a tarp or plastic sheeting.