2. Installation

PNEG-1112 Sidewall Bin Stair Assembly

19

5. Attach the 9-1/2" sidewall post in between the platform and the inside siderail extension on the final

corner of the platform using three (3) 5/16'' x 3/4'' bin bolts and serrated flange nuts. The post
should point down from the top of the platform. The head of the bin bolts should be on the inside of
the platform.

Figure 2N

6. Bolt the two (2) 20'' sidewall stair handrails to the outside of the 51-1/2'' left platform post and the

outside of the corner post using four (4) 5/16'' x 1-1/2'' carriage bolts and serrated flange nuts. Make
sure that the handrails are fully seated on the posts.

Figure 2O