40

PNEG-1112 Sidewall Bin Stair Assembly

5. Where the assembled lower handrail meets the 51-1/2'' right platform post, use one (1)

1/4'' x 1'' self drilling screw to attach it to the outside surface of the post. The head of the screw
should be on the inside surface of the 51-1/2'' right platform post.

Figure 2AX

Upper Handrail Installation

1. Using the matching length of handrail to the installed lower handrail, use one (1) 1/4'' x 1''

self drilling screw to attach the lower end of the handrail to the outside surface of the lowest
handrail baluster. The head of the screw should be on the inside surface of the handrail baluster.

Figure 2AY