Assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1579 User Manual
Page 22

22
12" & 16" Series II Sweep PNEG-720-G2
Assembly
2. FLIGHTING ASSEMBLY
A. Layout the flight sections in order of
assembly starting with the head flight
working towards the tail flight.
B. Using the connecting stubs, bolt the
flight sections together with hex bolts
and lock nuts. Make sure the flight ends
are in time with each other.
12"
2" x 11 1/2" Connecting Stub
Four (4) 5/8"-11 x 3 1/2" Hex Bolts
16"
3" x 13" Connecting Stub
Four (4) 3/4"-10 x 5 1/2" Hex Bolts
C. Slide the end stub through the bearing plate on the tail section and into the tail flight securing it with hex
bolts and lock nuts.
12"
2" x 12" End Stub
Two (2) 5/8"-11 x 3-1/2" Hex Bolts
16"
3" x 14 7/8" End Stub
Two (2) 3/4"-10 x 5-1/2" Hex Bolts
hex bolt
lock nut
connecting stub
hex
bolt
lock nut
end
stub
FIG. 2-B
FIG. 2-C