Assembly, Electrical assembly, Fig. 15-b – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1579 User Manual
Page 49

Assembly
37
PNEG-720-G2 12" & 16" Series II Sweep
See the chart for the correct size of conduit to the corresponding sweep size.
15. ELECTRICAL ASSEMBLY
Caution! All electrical wiring and service work must be performed by a qualified
electrician and must meet all State and Local electrical codes.
Sweep Section Conduit Sizes
Bin
10' Conduit
Other
Diameter
Pieces
Pieces
36'
N/A
1 @ 9'
37'
1
N/A
39'-40'
1
1 @ 1'
42'
1
1 @ 2'
43'-45'
1
1 @ 3'
48'-49'
1
1 @ 5'
51'
1
1 @ 6'
54'-55'
1
1 @ 8'
57'
1
1 @ 9'
59'
2
N/A
60'
2
1 @ 1'
62'-63'
2
1 @ 2'
66'
2
1 @ 4'
68'-69'
2
1 @ 5'
72'
2
1 @ 7'
75'
2
1 @ 8'
78'
3
N/A
80'-81'
3
1 @ 1'
84'
3
1 @ 3'
87'
3
1 @ 4'
88'
3
1 @ 5'
90'-91'
3
1 @ 6'
92'
3
1 @ 7'
95'
3
1 @ 8'
98'
4
N/A
105'
3
1 @ 9'
113'-120'
4
N/A
A. Place the 3/4" rigid conduit in order starting with the head section
and working towards the tail or extension section.
B. Connect the rigid conduit together using one (1) 3/4" conduit
coupling between each piece of conduit.
3/4" conduit
coupling
3/4" rigid
conduit
3/4" rigid
conduit
FIG. 15-B