Level the base on a concrete foundation, Connect the optional storage tank – Xylem AquaBoost CS and VS Pumping Packages User Manual

Page 28

Advertising
background image

Level the base on a concrete foundation

1. Place the pump package on its concrete foundation.
2. Place 1.00 in./(25.40 mm) thick steel shims or wedges on both sides of each anchor

bolt in order to support the pump package.
Make sure you also place the shims or wedges midway between the bolts.
This also provides a means of leveling the base.

Connect the optional storage tank

1. If the unit is a simplex configuration, then install the tank to the top connection of the

discharge cross as shown:

Constant speed

Variable speed

1

2

RS000019

1.

Storage tank

2.

Discharge gauge

1

2

RS000021

1.

Storage tank

2.

Discharge gauge

2. If the unit is a duplex configuration, then connect the tank to the discharge manifold as

shown:

Constant speed

Variable speed

1

2

RS000020

1.

Storage tank

2.

Discharge gauge

1

2

RS000022

1.

Storage tank

2.

Discharge gauge

Installation

26

AquaBoost CS and VS Pumping Packages Installation, Operation, and Maintenance Manual

Advertising