Quick start, Quick, Start – YSI 5000 User Manual

Page 8

Advertising
background image

5

3. Quick

Start

When you unpack your new Model 5000 or 5100 there are several things you’ll want to do to set
the instrument up.

1. Inspect the product to assure that it has not been damaged during shipment.

2. Check the packing list to make sure you have received everything you should have.

3. Install the batteries (see 11. Maintenance, Batteries).

4. Plug the power supply into its mating connector on the back of the meter (see 4.3

Rear Panel).

5. Prepare the DO probe, as discussed in the Probe Operations Manual, and plug it into

the connector on the back of the instrument.

6. Depress the (on/off ) key (see 4.1 Front Panel).

7. Set the date and time (see 5.4 System Setup).

8. Calibrate the system in a known oxygen environment (see 6.1 Dissolved Oxygen

Calibration).

You are now ready to make dissolved oxygen and temperature readings.

Advertising
This manual is related to the following products: