6503 – ce breakout box, Wall mounting – YSI 6500 Environmental Process Monitor User Manual

Page 83

Advertising
background image

Accessories Appendix

D

6503 – CE BREAKOUT BOX

Figure 5

The 6503 CE Breakout Box is required when
deploying the sonde longer than the field cable
length from the monitor. If you are using your
YSI 6500 with a Breakout Box in a CE
applications, you must use the #6503 Breakout
Box. This will allow you to comply with the
Residential, Commercial and Light Industrial
Class B Limits for radio-frequency emissions
specified in EN55011 (CISPR11) for Industrial,
Scientific and Medical laboratory equipment. The
Breakout Box has one MS-8 connector for connection to the sonde cable and one conduit fitting
for connection with the YSI #6508 Junction Box. For direct connection to the 6500 Monitor, a
#6507 Patch Cable and Gland Fitting (YSI 064007) are required.

6503 Breakout Box, 6” x 4” x 4”

The Breakout Box may be mounted on a wall or to a vertical pipe or handrail that is 1 to 1½
inches in diameter. Rail mounting the 6503 Breakout Box requires the optional the 6509 Rail
Mounting Kit. The location of the 6503 Breakout Box should be elevated and in a dry place
above potential flood level. The Breakout Box should be easily accessible for an operator or
technician to have convenient access to the unit.

The 6503 Breakout Box should not be mounted on hot or vibrating pipe or structure, near a high
heat source, near an AC motor or transformer, radio transmitter or antenna.

Do not mount on electrical conduit.

WALL MOUNTING


Although the Breakout Box is designed for outdoor deployment, some operators may prefer the
convenience of reading the monitor under shelter, for example, inside a nearby building. Wall-
mounting the Breakout Box is a simple process using the enclosed mounting hardware.

1.

Loosely fasten the mounting brackets (included) to the back of the Breakout Box with the
mounting screws provided.


2.

Tighten the screws, securing the brackets to the Breakout Box.


3.

Loosely fasten the Breakout Box to the mounting surface with the mounting screws
provided.

4.

Tighten the screws, securing the Monitor to the surface.




YSI Incorporated

6500 Environmental Process Monitor

80

Advertising