Rail mounting – YSI 6500 Environmental Process Monitor User Manual
Page 84
Advertising
Accessories Appendix
D
RAIL MOUNTING
1. Securely fasten both mounting brackets
(included with the 6502) to the back of the 6502
Breakout Box as shown in Figure 6, with the
mounting screws provided.
Figure 6
2. Fasten the top and bottom of the 6502, with
installed brackets, to the rail using the u-bolts,
plates, lock-washers, and nuts as shown in
Figure 7.
Ensure that all hardware is tightened.
Figure 7
YSI Incorporated
6500 Environmental Process Monitor
81
Advertising