YSI 6500 Environmental Process Monitor User Manual

Page 99

Advertising
background image

Accessories Appendix

D

6512 – SONDE MOUNT KIT FOR 6820/6920 SONDES

The 6512 Sonde Mount Kit enables a 6820/6920 sonde to be deployed in a permanently mounted
three-inch schedule 40 PVC tube, not included in kit, approximately 10 feet in length. The tube
is mounted to 1-1½” diameter railing by included brackets and u-bolts. The sonde will be
deployed by gently sliding it down the tube
where it will rest on a Stop Cap at the end
of the tube. The probes and probe guard
will protrude through a hole in the stop cap
at the end of the tube.

The 6512 Kit should not be mounted on hot
or vibrating pipes or structures, or near a
high heat sources, AC motors or
transformers, radio transmitters or antennas.
Do not mount on electrical conduit.

Avoid routing the sonde cabling near wiring
associated with rotating machinery and/or
equipment involving electrical switching or
regulation. Consider placing sonde cables
in grounded metallic conduit if unstable
readings appear due to electromagnetic interference.

Sond

e

Figure 26

Stop Cap

Schedule 40
PVC Pipe


The following steps should be followed when rail mounting the 6512 Sonde Mount Kit.

1. Attach the Stop

Cap to the end of
the PVC pipe
using PVC
cement, as per
instructions on
cement can label,
ensuring the Stop
Cap is positioned
straight and the
pipe is fully
inserted.


2. Loosely fasten

two 1½” u-bolts
on each
mounting plate to the railing, orientated as shown in Figure 27.

Figure 27

Mounting
Plates

1.5” U-Bolts

3” U-Bolts

3. Loosely attach the 3” u-bolts to the mounting plates, orientated as shown in Figure 27.

4. Slide the uncapped end of the PVC pipe up through the 3” u-bolts until there is

approximately 1” of the PVC pipe above the upper mounting plate, and tighten 3” u-bolts.


Note:
Do not over tighten u-bolts or deformation of the PVC pipe may occur.

YSI Incorporated

6500 Environmental Process Monitor

96

Advertising