Accessories Appendix

D

6504 – BREAKOUT BOX


The 6504 Breakout Box is required when deploying
more than one sonde from the 6500 Monitor (see
Figures 8 & 9). The Breakout Box has two MS-8
connectors for connection to the sonde cables and one
conduit fitting for connection with the YSI #6508
Junction Box. For direct connection to the 6500
Monitor, a #6507 Patch Cable and Gland Fitting (YSI
064007) are required.

Figure 8

The Breakout Box may be mounted on a wall or to a
vertical pipe or handrail that is 1 to 1½ inches in
diameter. Rail mounting the 6504 Breakout Box
requires the optional 6509 Rail Mounting Kit. The
location of the 6504 Breakout Box should be elevated
and in a dry place above potential flood level. The
Breakout Box should be easily accessible for an
operator or technician to have convenient access to
the unit.

Figure 9

The 6504 Breakout Box should not be mounted on
hot or vibrating pipe or structure, near a high heat
source, near an AC motor or transformer, radio
transmitter or antenna.

Do not mount on electrical conduit.


WALL MOUNTING

1.

Loosely fasten the mounting brackets (included) to the back of the Breakout Box with the
mounting screws provided.


2.

Tighten the screws, securing the brackets to the Breakout Box.


3.

Loosely fasten the Breakout Box to the mounting surface with the mounting screws
provided.

4.

Tighten the screws, securing the Monitor to the surface.


RAIL MOUNTING

1.

Securely fasten both mounting brackets (included with the 6504) to the back of the 6504
Breakout Box as shown in Figure 8, with the mounting screws provided.


2.

Fasten the top and bottom of the 6504, with installed brackets, to the rail using the u-
bolts, plates, lock-washers, and nuts as shown in Figure 9.


3.

Ensure that all hardware is tightened.