Accessories Appendix

D

WARNING!

Wiring should be performed by a qualified electrician.

Do not make connections while power is applied.

Disconnect power before proceeding.


IMPORTANT! It is essential that all sensor wiring be run in a separate conduit from power
wiring.

SONDE CABLE CONNECTIONS (SDI-12 COMMUNICATIONS LINK)


In remote Breakout Box installations, Figure 17, the 6500 Monitor uses a standard MS-8
connection to interface with the 6 ft (1.8 m) 6507 Patch Cable that is connected in the 6508
Junction Box. The Junction Box is then connected by conduit and three- conductor cable to the
Breakout Box(s). The customer is advised to supply rigid conduit and 18 AWG or heavier
shielded multi-conductor cable to connect between the Junction Box and the Breakout Box at the
Sonde installation site. This configuration allows a maximum cable length of 250’ between the
6500 Monitor and the sonde(s). The cable from the Junction Box should be landed to TB-1 in the
breakout box. The MS-8 connector for sonde hookup is pre-wired to TB-2 or TB-3.

Enter

Esc

Cal

6500

6500

EN VIRO N MEN TAL

EN VIRO N MEN TAL

MO N ITO RIN G

MO N ITO RIN G

SYSTE M

SYSTE M

21.2 Temp
7.35 DO
6.53 pH

Junction Box

6508

Sonde cables

w/ MS-8

Stream

Sondes

Breakout Box

Conduit &

6507

6’ Patch cable

w/ MS-8

customer-supplied
3-conductor cable

Figure

17

The Junction Box, Figure 17, conductor color code is:

(1)

Red

+12

VDC

(2)

Black

Common

(3)

Blue SDI-12

YSI Incorporated

6500 Environmental Process Monitor

88

Advertising