Operation 4-14 – Alpha Technologies CE-G Series User Manual

Page 39

Advertising
background image

4. Operation

4-14

031-093-C0-001 © 3/99

7.

CEG Enclosures Used In Remote Applications

The collocated CEG enclosure can be converted to be a remotely located

enclosure at distances of no more than 25 feet from the APU. This remote

operation requires the use of interconnecting buried gas pipe, between the

APU cabinet and the CEG cabinet. All pipe and pipe fittings running from the

CEX to the CEG will be installed in accordance with local code. All materials

used must meet approval of all local codes.

CAUTION:

Due to the Low Pressure Output of the CEG,

(1"), all interconnecting gas pipe must be 1"

to 3/4" inch diameter to ensure proper flow.

G A S

3 " S W E E P

R E Q U I R E D I F C E - G
C A N N O T B E S E E N

P R O P A N E V A P O R

M A N U A L S H U T O F F

D W Y E R L O W

F U E L S E N S O R

Figure 4.21, Remote CE-G arrangement

Advertising