Alpha Technologies CE-G Series User Manual

Page 41

Advertising
background image

4. Operation

4-16

031-093-C0-001 © 3/99

End of conversion Procedure

1.

Securely fasten all hoses.

2.

Open previously-filled gas bottles.

3.

Perform leak check with approved leak-detection solution

7.1

Converting Collocated CEG Enclosure For Remote Application

3. Install the gas hoses to the brass fitting located on the inside of remote

gas utility box. (see picture)

4. Hook up interconnecting gas pipe to the remote utility gas box pipe

fixture.

Figure 4.24,Hose connection

Advertising