18
Figure 26: Before and After.
29. Remove the block from the factory transmission lines.
30. Assemble the AEV supplied transmission oil cooler lines to the block (fig 27).
A
B
C
D
c
d
Figure 27
31. Install the new transmission oil cooler line assembly to the power train (fig 28).