Vii. new engine start-up procedure – American Expedition Vehicles JK HEMI Builder Kit - Installation Guide for 12+ JK Wrangler User Manual

Page 34

Advertising
background image

32

g. Remove both 10mm ground nuts from the lower driver side inner body located next to floor pedals.

Connect routed through module harness to module (connector E). Reinstall both 10mm ground

nuts.(fig 52).

Figure 52

h. Reinstall all trim panels.
i.

Position the V8 Decals as shown.

3/4”

[

PLEASE NOTE: The new position of the V8 motor on top of and in front of the front axle causes approxi-

mately 430 lbs of weight to be shifted to the front axle and suspension. Stock springs will see approxi-

mately 1” of drop. Aftermarket springs will vary depending on the manufacturer of the springs.

VII. NEW ENGINE start-up procedure

1. Double check all connections, wiring, mechanical fittings and fasteners.

2. Fill all fluids. Refer to factory service manual for proper fluids for your model year Jeep. Engine oil cap

will specify viscosity and type. Use dip sticks to verify proper fill levels. Check to ensure transmission,

coolant, brake, and power steering fluids are all filled. Use only MOPAR +4 Transmission Fluid in the

transmission.

DO NOT FORGET TO BLEED YOUR BRAKES. Follow proper brake bleeding procedures as outlined in

your service manual.

Advertising