V. engine bay preparations – American Expedition Vehicles JK HEMI Builder Kit - Installation Guide for 12+ JK Wrangler User Manual
Page 23
Advertising
21
V. ENGINE BAY PREparations
1. Remove the factory coolant bottle.
2. Remove fan assembly
3. Remove AC lines. Save the pressure switch and O-Ring for later use.
4. Remove the cooling module.
5. Strip the cooling module. Everything will be reused except the radiator.
6. Install the supplied power steering cooler. Use the AEV supplied spring clamps NOT the hose clamps
provided with the cooler (fig 31).
Figure 31
7. Install the AC condenser/transmission oil cooler/steering cooler assembly onto the supplied AEV
Hemi radiator using the factory hardware and supplied p-clips, and petcock (fig 32).
Figure 32
Advertising