4 hydraulic connections, 1 regulations, Installing the boiler in existing installations – DE DIETRICH ELITEC DTG 130 Eco.Nox User Manual

Page 21: 2 hydraulic connection of the heating circuit, Heating flow, Heating return

Advertising
background image

21

01/02/11 - 300002915-001-E

DTG 130 Eco.NOx

4.4 Hydraulic connections

4.4.1

Regulations

Installation must be carried out in accordance with the prevailing
regulations, the codes of practice and the recommendations in these
instructions.

„

Installing the boiler in new installations
(installations less than 6 months old)

- Clean the installation with a universal cleaner to eliminate debris

from the appliance (copper, flaxen thread, flux).

- Thoroughly flush the installation until the water runs clear and

shows no impurities.

„

Installing the boiler in existing installations

- Remove sludge from the installation.
- Flush the installation.
- Clean the installation with a universal cleaner to eliminate debris

from the appliance (copper, flaxen thread, flux).

Thoroughly flush the installation until the water runs clear and shows
no impurities.
Installation must be carried out in accordance with the prevailing
regulations, the codes of practice and the recommendations in these
instructions.

„

Important recommendations for connecting the
boiler to the heating circuit



Between the boiler and the safety valves there must be no
complete or partial closing device.
France: DTU - 65.11, § 4.22 - NF P 52-203



Heating installations must be designed and implemented
to prevent heating circuit water and products contained in
it returning to the drinking water system (article 16-7
Departmental Health Regulations). A CB disconnector
(area disconnector for different uncontrollable
pressures)must be installed for filling the heating circuit
according to the NF P 43-011 standard.

Before connecting the heating circuit hydraulic connections, it is
essential to rinse the heating circuits to remove any particles which
might damage certain components (safety valve, pumps, valves...).
In the event where the burner is located at the highest point in the
installation, a dry running or water pressure control device my be
fitted.

4.4.2

Hydraulic connection of the heating circuit

1. Heating flow

2. Heating return

3. Drain cock (connection for 14 mm interior diameter pipe)



Insulate the heating flow and return pipes only outside the
casing.



The drainage device can be connected with a flexible hose.

4.4.3

Hydraulic connection of the water circuit for domestic use

Z

See: Domestic hot water calorifier instructions.

Advertising