2 electronic boards connectors, 3 main board connections, Installation 3.7.2 electronic boards connectors – Hach-Lange ORBISPHERE 410 User Manual User Manual

Page 31

Advertising
background image

29

Installation

3.7.2 Electronic boards connectors

Connectors P8 on the main board, and connectors J7 and J8 on the measurement board are
made of two parts. Push down carefully the black levers on either side of the connector and pull
it out securely. Perform all connections with these connectors unplugged. Once finished, attach
the connectors to the boards by pushing them firmly in place (levers up).

3.7.3 Main board connections

Figure 11 Main board

Figure 12 Connector P8

Figure 13 Connector P3

Connector P8:

1.

RS-485 (signal A)

2.

RS-485 (signal B)

3.

PROFIBUS-DP (GND)

4.

PROFIBUS-DP (+ 5 V)

5.

PROFIBUS-DP (signal -)

6.

PROFIBUS-DP (signal +)

7.

PROFIBUS-DP (signal RTS)

8.

Not used

9.

Not used

10.

Not used

11.

System alarm relay (N.O.)

12.

System alarm relay (N:C.)

13.

System alarm relay (Common)

Connector P3
Ethernet RJ 45. Connect the instrument to the local network by passing an ethernet cable
through the ethernet cable gland (location illustrated in

Figure 4 on page 21

for the wall mount

and

Figure 8 on page 24

for the panel mount). Connect to the P3 connector illustrated above.

Advertising