Set-up

FZ-4S

Page 16

FZ-4S_e_0205.fm



6HWXS

 ,QLWLDO VWDUWXS

The wall sawing system is delivered ready for

use. All instructions in this chapter are equally

valid at the initial start-up.

 3UHSDUDWRU\ RSHUDWLRQV

Always proceed as follows:

z

Sort out fundamental conditions

z

Secure the site

z

Decide on position and sequence of the
cuts

z

Select saw blade

z

Carry out a visual inspection

Always pay detailed attention to the following

before using the system:

3RVLWLRQ RI VXSSO\ OLQHV

z

Determine the position of pipes and cables
in walls and ceilings.

:DWHU

Where does the cooling water used for sawing

flow to?

z

Think about water damage to the electrical
supply.

6HFXUH WKH VLWH

z

Secure the area where the wall sawing
system will be used.

z

Access by those not involved should be
prevented.

z

When cutting walls consider the other side
of the wall.

z

Secure this area as well.

6HFXULQJ FXWRXWV

z

Secure cutouts from walls and especially
from ceilings by suitable means, e.g. crane,
supports, etc.

z

Check the weight of concrete.

(1m³= 2400-2700 kg)

3RVLWLRQ RI FXWV

z

Find out about the concrete to be sawed:

- Where does the reinforcement run?

- Is it heavily or lightly reinforced?

- Is it suitable for steel plug fixing?

z

Decide on the position and sequence of
cuts before starting work. For example, for
a door cutout carry out the bottom cut first,
then the side cuts and finally the top cut.

5DLO OHQJWK

z

Determine the rail length for the intended
cut.

z

Leave sufficient projection for the wall saw
head.

Cut across the reinforcement if possible

The wrong sequence of cuts can lead to
jamming of the blade or to damage to the
equipment.