Fz-4s set-up – Diamond Products FZ-4S User Manual
Page 21
FZ-4S
Set-up
FZ-4S_e_0205.fm
Page 21
3URFHGXUH
z
Mark cutting line on the concrete
z
Mark dowel line at a distance of 22 cm.
(The same distance applies for flush cuts)
z
Drill dowel hole and fit dowel according to
dowel manufacturer’s instructions
z
Mount V-rail supports (9) on V-rails (1).
z
Mount rail unit on concrete and align using
cut guide (10)
z
Align rail unit with adjusting foot (8), so that
all adjusting feet (8) and the adjusting
screws (4) are supported by the concrete.
z
Tighten rail unit (1)
5DLO OLPLW VWRS
z
Mount rail limit stop on the end of the rail, so
that the wall saw head cannot fall off the
rail.
Clearance between rail supports:
- where a single rail is used, as high as possible
- where a number of rails are used, evenly distributed
along the entire length of rail.
Once rail unit has been mounted
check adjusting nut (3) and
clamping block (6) anchoring