Installation

23

F232102

After the anchor bolts are installed and the concrete
has cured, proceed as follows:

1. Place the washer-extractor adjacent to the

foundation. Do not attempt to move it by pushing
on the sides. Always insert a pry bar or other
device under the bottom of the frame of the
washer-extractor to move it.

2. Remove the wood skid by unscrewing the

carriage bolts holding it to the bottom frame of
the washer-extractor.

3. Place the washer-extractor carefully over the

anchor bolts. Never attempt to lift the machine by
the door handle or by pushing on the cover
panels.

4. Raise and level the washer-extractor 1/2 inch off

the floor on three points, using spacers such as
nut fasteners.

5. Fill the spaces between the washer-extractor base

and floor with a good quality non-shrinking
machinery grout to ensure a stable installation.
Refer to Figure 11 for grouting the 135 pound
capacity model. Refer to Figure 12 for grouting
the 250 pound capacity model.

Figure 11

Figure 12

6. Remove the spacers carefully, allowing the

washer-extractor to settle into the wet grout.

7. Position the mounting bolt washers and locknuts

on the anchor bolts and fingertighten locknuts to
washer-extractor base.

8. After the grout is completely dry, tighten the

locknuts by even increments – one after the
other – until all are tightened evenly and the
washer-extractor is fastened securely to the floor.

9. Remove the four red transport brackets used to

secure the washer-extractor during shipping.
Refer to Figure 13.

NOTE: Check and retighten the locknuts after five
to ten days of operation and every month
thereafter.

R007I

1

Bolt Holes

2

Frame Rails

R077I

1

135

1

2

CFS216N

250

4 in.

(102 mm)

4 in.

(102 mm)

62 in.

(1575 mm)

71 in.

(1803 mm)

4 in.

(102 mm)

4 in.

(102 mm)