12. Realign at operating temperature, if necessary.

13. Make sure that the pump is properly greased or oiled.

Pump with Packed Seal

Adhere to the following:

1. Make sure that the gland is fi nger tight before fi lling the system.

Start-Up Service

If start-up service has been included in the order, the factory should be contacted
after the installation has been successfully completed and approved by the
client’s representative or engineers. Where possible, contact the factory at least
three weeks before a Fulton service engineer is required on site.

Consider the following in preparation for your on-site visit:

1. All procedures covered in manual sections Start-Up Preparation and

Fill the System, including installation review, air testing of piping, pump
alignment (where applicable), and fi lling the system must be completed
before the service person’s arrival.

2. Depending on the size of the system and the amount of service time

contracted, start-up service includes fi ring the heater, checking, verifying
and adjusting all safety settings.

3. Careful preparation can expedite the commissioning of your heater. Most

delays can be avoided by following the instructions in this manual. Failure
to complete required procedures properly can result in the need for further
service time, at extra cost to the customer.

4. Service people will not commence start-up if there are obvious system

defi ciencies. However, start-up service in no way constitutes a system
design check or approval of the installation.

5. In addition to commissioning the heater, the service person will also

familiarize heater room personnel with the operation of all Fulton
equipment. Personnel must be qualifi ed to understand the basic operation
and function of controls.

Initial Start-Up

These instructions are for use when the unit is being started up for the fi rst
time, or after prolonged shutdown. They are to be used in conjunction with the
specifi c procedure information in manual section Routine Operation.

Cold Circulation

1. Turn on the main power switches.

2. Check for proper fl uid level in the expansion section of tank. See Figures 12

!

WARNING

All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.

Never attempt to operate equipment that
has failed to pass all safety checks.

This heater is equipped with an ignition
device which automatically lights the
burner. Do not try to light burner by hand.

Operating this equipment beyond its
design limits can damage the equipment
and can be dangerous. Do not operate the
equipment outside of its limits. Do not try
to upgrade the equipment performance
through unapproved modifi cations.
Unapproved modifi cations may cause
injury, equipment damage, and will void
the warranty.

Before commissioning the unit, verify with
proper authorities that gas lines have
been purged.

Check daily that the equipment area
is free and clear of any combustible
materials, including fl ammable vapors
and liquids.