Fairbanks 6020 Series Titan Motor Truck Scale User Manual

Page 12

Advertising
background image

7.

Base Plate Completion:

Check that all locating tools are properly aligned and flush with the receiver
cups. Drill the holes for the base plate anchors using a hammer-drill and the

5

/

8

" drill bit. Tap the anchors into clean holes and tighten the nuts securely.

8.

Installing Load Cells:

a.

Unpack the load cells and mark each calibration certificate with the cell
location/position.

b.

Starting at one end of the assembled platform, place hydraulic jacks at the
corners so the section can be lifted off the locating tool. Two (2) hydraulic jacks
may be required.

c.

Lift the platform so the load cell locating tool can be removed from the upper
and lower bearing cups. Once removed, fill both cups with grease.

50745

12

03/10 Rev. 5

Use eye protection!

50745-10

Advertising