Operation, 1 operational conditions for positioning operation – IAI America RCA2-TW4N User Manual

Page 60

Advertising
background image

52

7. Operation

7.

Operation

7.1

Operational Conditions for Positioning Operation

By following the procedures below, check whether the operation is available.

[1] Usage conditions

Check the operational conditions [1] to [6].
[1] Load installation orientation (horizontal, upright, vertical)
[2] Stroke L (mm)
[3] Maximum speed V (mm/s)
[4] Acceleration a (G)
[5] Loading capacity W (kg)
[6] Overhang T (mm): Distance from the end face of the table to the center of gravity of the load

Installation orientation Fig. 1

l

a

c

i

t

r

e

V

t

h

g

i

r

p

U

l

a

t

n

o

z

i

r

o

H

Advertising