2 tools, 4 installation procedures, 1 preinstalled components – IEI Integration RPC-6106_6108 User Manual
Page 31: 2 user installed components, Nstallation, Rocedures

RPC-6106/6108 Rackmount LCD Workstation
4.3.2 Tools
Before installing the RPC-6106/6108 Rackmount LCD Workstation, make sure the
following tools are on hand:
Phillips (crosshead) screwdriver: All the retention screws on the system
are Phillips screws.
Soft working mat: When installing the RPC-6106/6108 Rackmount LCD
Workstation, the screen should be placed face down on a soft working mat.
4.4 Installation Procedures
4.4.1 Preinstalled Components
The following components are preinstalled in the RPC-6106/6108 Rackmount LCD
Workstation.
Power supply unit (PSU)
Cooling fan modules
Drive brackets
LCD screen
4.4.2 User Installed Components
The following user supplied components need to be installed into the RPC-6106/6108
Rackmount LCD Workstation:
Disk drives
Backplane and CPU card
PCI or ISA expansion cards (optional)
Page 21