SaltDogg 92426SSA Under Tailgate Spreader User Manual

Page 3

Advertising
background image

3

TM

3. Spinner assembly installation: (See installation

drawings on pages 3 and 4.)
A. Attach the spinner shield (Item 2) to the spinner

frame (Item 1) using (2) 5/16-18 x 1-1/4 cap screws,
5/16 flat washers and (2) 5/16-18 hex flange nuts.
B. Attach the spinner disk sub assembly to the

hydraulic motor on the spinner frame and tighten
the set screw in the disk collar.
Note: Be sure to lubricate the hydraulic motor
shaft generously with Never Seez lubricant before
assembling.
C. Attach the spinner frame assembly to the lower

tray of the spreader with the hinge rod and attach
(2) hairpin cotter pins.
D. The leveling mechanism may now be mounted.

Park truck on flat, level surface. With spinner
assembly in level position, carefully measure “L”
and “D” distances. Use any of 3 available holes in
height adjustment bracket. Locate bar or spinner
lug such that ½” hole will position with D1=D and
L1=L. Modify angle if necessary.
E. Secure bar or spinner lug to the truck frame.
F. Attach parallel linkage rods to heights

adjustment bracket and angle. Secure them using
½” washers and hair pins.
G. Clamp parallel linkage rods together. To verify

leveling action, slowly raise the dump. Be sure that
spinner motor assembly and linkages do not have
any interference with truck body and it does not
have contact with the road. After checking weld
parallel linkage bars together.
H. Keeping the spinner assembly level, remove

the set screw from the clamp collar and secure
the spinner frame in place using the spinner
assembly lock.

Truck Frame

Hinge Rod

Spinner

Frame

Spinner Lug or Bar

Spreader

Dump Body

Hinge

Bar

Parallel

Linkage

Hole

L1

L

Parallel Linkage, Spinner Frame & Bar

Installation Drawings

Advertising