< 3. INSTALLATION, PIPING AND WIRING >

3-12

IM 12T03A01-02E

Sampling line

Heat insulating material

Trace pipe

Figure 3.17

Steam Tracer Pipe

Sampling unit

Drain pit

Steam trap

Figure 3.18

Piping at Steam Trap Discharge Outlet

3.3.4 Piping for Air Purge

If the density converter is installed in dusty environment, air purging is recommended.

Air purge should be performed continuously by clean dried air with pressure of 50 kPa G. Size Ø6
x Ø4 mm copper or stainless pipe should be used to connect air source to the purge air inlet of the
converter.

The air inlet is Rc1/8 female connection. If specifi ed, a connector for an Rc1/4 female or 1/4NPT
female screw is provided.