GW Instek PEL-2000 Series User Manual User Manual
Page 84

PEL-2000 Series User Manual
84
Load D-Time
Load Delay time is used to delay activating a load
(up to 10 seconds) after the load key has been
pressed. However the Load D-Time setting will
only work for loads that are initiated manually or
when the PEL series mainframe is configured to
Auto load (page 182) at run time.
Step Resolution
Each channel voltage, current and resistance setting
can have the step resolution configured.
For example if the step resolution for CCH (CC
high range) is .5 A, then the resolution can be
incremented in .5A steps;
8.08.59.09.5
The step resolution parameters apply to the
following:
CCH Step – CC high range
CCL Step – CC low range
CRH Step – CR high range
CRL Step – CR low range
CV Step – CV high range
Step Resolution
Range
The step resolution range is dependent on the load
module and the range:
Max resolution: channel range/4000
Min resolution: channel range/2