Device rs-nagt / rs-nagt.1 – NORSTAT Safety Relays User Manual

Page 16

Advertising
background image

DEVICE

RS-NAGT / RS-NAGT.1

Emergency stop and safety gate monitoring relay

APPLICATIONS

with time-delayed safety output

APPROVALS

CE, TÜV, UL, C-UL

CONTACTS

2 normally open safety, 1 normally open time-delayed safety output

Selectable opposite polarity between channels

SPECIAL CHARACTERISTICS

NAGT : 0,1s - 10s ; NAGT.1 : 0,3 - 30s (ask for the ordering number)

Ask for special versions

LED

Power, channel 1, channel 2 and fault

Devices has two voltages : 1 voltage fixed : 24 V DC;

OPERATING VOLTAGE

Selectable : 24, 110-127 and 230 V AC

(with galvanic disconnection/transformer)

POWER CONSUMPTION

ca. 3 VA

START UP DELAY / FALLBACK TIME

<150 ms/< 50 ms (undelayed)

CONTACT CAPACITY max.

6 A, 250 V AC, 24 V DC

CONTACT CAPACITY min. at 24V DC (*)

100 mA

(*)

SIMULTANEITY

Simultaneous protective door contacts : ca.75 ms

ENVIRONMENTAL TEMPERATURE

- 25°C to + 50°C

SWITCHING CAPACITY

1500 VA (resistive load)

CONTACT SECURITY

10 A quick acting or 6 A time lag

OPERATING MODE

(*) We offer all devices who have a CONTACT

CAPACITY of min. 100 mA at 24 V DC with

hard gold-plated contacts. In this way the

CONTACT CAPACITY of min. 100 mA is only 4 mA.

Please ask our sales team!

CONNECTION DIAGRAM

A supply voltage must be applied to terminals A1 and A2 (for AC supplies)

or terminals B1 and B2 (for DC supplies). Once the supply voltage is

applied, 24V DC is available at terminal T11; power LED illuminates.

Terminals T12, K21 and K22 must be connected according to the

application example selected to meet the application requirements.

Feedback monitoring of external devices is accomplished by a connection

between terminals T34 / X1 and X2. If the application does not require

external monitoring, T34 / X1 and X2 must be bridged. To start the unit,

terminal T11 and T34 / X1 must be bridged (automatic reset) or a

momentary bridging of T11 and T34 / X1 must take place. With all of the

above in place safety contacts 13-14, 23-24 and 77-78 close. Channel 1 (K2

energized) and channel 2 (K3 energized) green LEDs illuminate to show

channel status. Fault LED illuminates when a short circuit takes place, at the

input stage or internally.

(*) Special edition with hard gold-plated contacts is also available.

Connecting the ground wire to PE - see page 22.

T11 X2

Not-Halt

E-Stop

Start

T12

K21 K22

B1(+), PE/B2(-) : 24V DC-Anschluss oder A1, A2 : AC-Anschluss

PE/B2

mit Querschlusssicherheit

with opposite polarity

between channels

T11

ohne Querschlusssicherheit

without opposite polarity

between channels

PE/B2

T11

T34/

X1

Ebene 1

Level 1

2

1

Ebene 2

Level 2

Not-Halt

E-Stop

2

2

1

1

FUNCTION CIRCUIT DIAGRAM

power on

and control

cyclic test

el

ec

tron

ic

=

fus

e

channel 1

B1(+)

+

PE/B2(-)

-

unde-

layed

K2

K4

layed

de-

~

A2

~~

~~~

A1

T1

T34/X1

T11

T12

channel 2

K3

24

14

layed

de-

K3

layed

unde-

K5

78

K5

K4

logic,

K2

K22

X2

K21

13 23

77

Certifications according to

Safety relevant substance data

Depending on wiring (only max. values are given)

EN ISO 13849-1: PLe, Cat. 4 / PLd, Cat. 3 (time delayed)

MTTFd: 57 years / high, DC: Cat. 3: 90% / medium, Cat.4: 99% / high

CCF: achieved

NORSTAT INC. 300 Roundhill Dr. Rockaway, NJ 07866

Tel: 973-586-2500 Fax: 973-586-1590 www.norstat.com