HP Integrity rx4610 Server User Manual
Page 111

Chapter 8
Server Management Boards
103
4. Connect the 172 mm fan cables to the underside of the Power Distribution
Board (T-Docking). You can make the connection through the emptied
Hard Drive Bay.
5. Reinsert the Hard Drive Bay and secure the four front screws.
6. Reinsert the two hot swap drives into the Hard Drive Bay.
7. Connect the Internal SCSI cable to the I/O Baseboard.
8. Install the 120 mm fan cable into the top of the Power Distribution Board
(T-Docking).
9. Connect the DC-DC converter to the top of the Power Distribution Board
(T-Docking).
10. Connect AC input cables to both connectors on the AC Power Distribution
bracket.
11. Align the AC input bracket and install the two screws to secure it.
12. Install the bracket between the 120 mm fan housing and the AC input
bracket. Make sure that the fan cable can reach the connector on the Power
Distribution Board (T-Docking).
13. Install the Server Management cable.
14. Connect the power and data cables to the DVD and LS120 drives.
15. Install the power supplies.
16. Install the top cover as described in “Replacing the Top Cover” in
Chapter 2.