Selecting a rack location, Installing the rails in the rack, 1 identify the contents of the shipping carton – HP Secure Key Manager User Manual

Page 26

Advertising
background image

Figure 1 Identify the contents of the shipping carton

Item

Description

1

Appliance

2

Power cords (2 — 1 black, 1 gray)

3

Null modem cable

4

1U rack mounting hardware kit and documentation

5

Keys to the bezel (2 sets of 2 keys)

6

Documentation CD

7

1U spacer

8

USB key

9

Completed appliance information sheet,

Pre-installation survey and checklist, and Installation

poster

NOTE:

If this is a replacement appliance, note how the unit is packed in the shipping carton. Handle the

packing materials carefully so that you can repackage the old appliance using the replacement carton

and packing materials.

CAUTION:

There will be several tamper-evident labels. Do not cut or damage these labels because they are required

for FIPS compliance audits.

Selecting a rack location

Select a rack location that meets the space, airflow, temperature, power, and electrical grounding

requirements described in

Rack planning resources

.

For adequate airflow within the rack, use appropriate high airflow inserts in rack cabinet doors and

observe industry standard practices for adequate spacing between racks or rows of racks.

NOTE:

Do not install an appliance in the bottom unit of the rack; doing so will prevent the locking bezel cover

from opening.

26

Installing and replacing hardware

Advertising