Read before beginning installation, Installing 2940 air adjust residue manager kits – Yetter 2940 Short Floating Air Adjust Residue Manager User Manual

Page 26

Advertising
background image

26

INSTALLING 2940 AIR ADJUST RESIDUE MANAGER KITS


READ BEFORE BEGINNING INSTALLATION


ENGAGE THE CYLINDER STOPS ON THE
PLANTER LIFT WHEELS TO “LOCK” THE
PLANTER IN THE UP POSITION


Installation overview:

• Prior to installing check the freedom of motion of the row cleaner.

• The installation process should be done with the planter raised, half folded for

transport, and the row units fully extended down.

• Install the 2940 Residue Manager Mounting Bracket Assembly centered on the

planter row unit with provided hardware.

Advertising