Read before beginning installation, Installing 2940 air adjust residue manager kits – Yetter 2940 Short Floating Air Adjust Residue Manager User Manual
Page 27
Advertising
27
INSTALLING 2940 AIR ADJUST RESIDUE MANAGER KITS
READ BEFORE BEGINNING INSTALLATION
ENGAGE THE CYLINDER STOPS ON THE
PLANTER LIFT WHEELS TO “LOCK” THE
PLANTER IN THE UP POSITION
Installation overview:
1) Prior to installing check the freedom of motion of the row cleaner.
2) The installation process should be done with the planter raised, half folded for
transport, and the row units fully extended down.
3) Install the 2940 Residue Manager Mounting Bracket Assembly centered on the
planter row unit with provided hardware.
Advertising