INSTALLING 2940 AIR ADJUST RESIDUE MANAGER KITS


READ BEFORE BEGINNING INSTALLATION

ENGAGE THE CYLINDER STOPS ON THE

PLANTER LIFT WHEELS TO “LOCK” THE
PLANTER IN THE UP POSITION

Installation overview:

1) Prior to installing check the freedom of motion of the row cleaner.

2) The installation process should be done with the planter raised, half folded for

transport, and the row units fully extended down.

3) Install the 2940 Residue Manager Mounting Bracket Assembly centered on the
planter row unit with provided hardware.