Unpacking the switch – Allied Telesis AT-10408XP User Manual

Page 31

Advertising
background image

AT-10408XP 10-Gigabit Ethernet Switch Installation Guide

31

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.

3. Ensure the following hardware components are included in your switch

package. If any item is missing or damaged, contact your Allied Telesis
sales representative for assistance.

ˆ

Two rack-mount brackets

ˆ

Eight rack-mount bracket screws (stainless steel)

ˆ

One management cable

ˆ

Four power cords (one each for North America, the UK, Europe,
and Australia)

ˆ

Documentation CD

Advertising