Chapter 2: Installation

40

Note

For the terminal port pinouts, refer to “RJ-45 Style RS-232 Terminal
Port Pinouts” on page 48.

Powering On the

Switch

To power on the switch, perform the following procedure:

1. Plug the power cord into the AC power connector on the back of the

switch, as shown in Figure 18.

Figure 18. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.

3. Verify that the POWER LED is green. If the LED is OFF, refer to

Chapter 3, “Troubleshooting” on page 45.

The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Local Management Session” on page 41. T
o start a remote
management session, the switch must have an IP address. For
information about giving the switch an IP address and starting a
remote management session, refer to the AT-S83 Management
Software Command Line Interface User’s Guide
.

Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.



5

Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.



7

AT-PWR0

2

AC Po

wer Su

pply

PWR

GOOD

FAULT

AC INPUT

100-240V

AC

50/60H

z

3.0A

CAUTIO

N: DIS

CONN

ECT P

OWER

CORD P

RIOR T

O REM

OVAL O

F PSU

CAUT

ION: D

ISCON

NECT AL

L POW

ER CO

RDS T

O DIS

ABLE S

YSTE

M POW

ER

1219

Advertising