Installation – Alliance Laundry Systems HC35 User Manual

Page 35

Advertising
background image

33

Installation

F232062

Elevated Base Frame Installation

(2-Speed Models Only)

Note: The 3-speed and variable-speed
models should not be installed on elevated
base frames.

Factory-built elevated steel base frames are
designed to meet the specifications of the
2-speed model washer-extractor. See
Figure 21.

Figure 21

Use the following instructions and Figures
22 through 26 as a step-by-step guide to
installation of the elevated base frame.

1. Verify that the floor is 3500 psi minimum

reinforced concrete embedded in clean,
compacted fill dirt. The floor must be at
least 4 inches (102 mm) thick.

2. Use the elevated base frame as a template

by positioning the frame in the desired
location and marking the pre-drilled
mounting holes on the floor. See
Figure 22.

Figure 22

3. Adjust the drill depth gauge to match the

length of the J-bolt, minus 1-1/2 inches
(38 mm). See Figure 23.

Figure 23

H035I

H025I

H026I

Advertising
This manual is related to the following products: