Installation, Mechanical installation – Alliance Laundry Systems HC35 User Manual

Page 36

Advertising
background image

Installation

34

F232062

Mechanical Installation

(Continued)

4. Drill and chisel out a conical hole large

enough to accept the J-bolt. See
Figure 24.

Figure 24

5. Use compressed air or a squeeze bulb to

remove debris from each hole. Anchor
J-bolt in place, using an industry-accepted
anchoring compound. Verify that the
J-bolts are in the correct locations and that
1-1/2 inches (38 mm) of each J-bolt
protrude from the floor. See Figure 25.

Figure 25

6. Raise and level the base frame 1/2 inch

(13 mm) off the floor on three points,
using spacers such as nut fasteners.

7. Fill the space between the frame base

and the floor with a good quality
non-shrinking machinery grout to ensure a
stable installation. Grout completely under
all frame members.

8. Remove the spacers carefully, allowing the

base frame to settle into the wet grout.

9. Before grout sets completely, make a drain

opening in the rear of the base frame
grouting with a stiff piece of wire. This
opening should be approximately 1/2 inch
(13 mm) wide to allow any surface water
build-up under the base of the machine to
drain away. Do not omit this step.

10. Position washers and locknuts on J-bolts

and fingertighten nuts to machine base.

11. After the grout is completely dry, tighten

locknuts by even increments—one after
the other—until all are tightened evenly
and the base frame is fastened securely to
the floor. See Figure 26.

Figure 26

12. Position the machine over the base frame,

aligning the mounting holes on the
machine with the corresponding holes on
the frame.

H031I

H032IE1A

H033I

Advertising
This manual is related to the following products: