24

Component Operation and Checks


The following checks should only be performed by qualified

technicians using extreme caution.

Electrical hazard to untrained personnel may result in electrical

shock, burns, or death.

Heater Contactor

If there is 208v-230v across the coil and the contactor does not pull in, the contactor is

defective. If there is 208v-230v across terminals L1 and L2 and the contactor is pulled in,

but no voltage across terminals T1 and T2, the contactor is defective.

Heater Element

Check the heat element as follows:

1. TURN POWER OFF AT BREAKER PANEL.

2. Make sure the connections at terminals T1 and T2 on the heater contactor are tight

and the heater contactor is open.

3. Check the resistance between terminals T1 and T2 on the heater contactor.

Resistance should be 21 to 24 ohms. If not, the heat element is defective. If there is

no resistance, check the wiring connections in the heater box before assuming the

element is defective.

4. If there is no water in wash sink, fill until heat element is completely submerged.

5. Set test meter to read resistance and check for resistance between terminals T1 on

the heater contactor and ground and T2 on the heater contactor and ground. If there

is measured resistance to ground, the heat element is defective.

Heater ON/OFF Selector Switch

TURN POWER OFF AT BREAKER PANEL. In the "off" position, there should be no

continuity across terminals 3 and 4. In the "on" position, there should be continuity

between terminals 3 and 4. Remove the wires before checking for continuity.

Push ON / Push OFF Start and Stop Buttons

TURN POWER OFF AT BREAKER PANEL. The stop button should have continuity at

rest and no continuity when pushed in. The start button should have no continuity at rest

and continuity when pushed in. Remove the wires before checking for continuity.

Advertising