Providing Proper Electrical Service

The system is completely pre-wired and tested at the factory, and a hard-wired connection

from an appropriate power source junction box is all that is required.

The installer is to provide a disconnect that should be incorporated in the fixed wiring.

Properly sized watertight conduit, fittings and parts are required, as well as the appropriate

gauge wire.

If your system is a “left-to-right” unit, you should locate the power source junction box at

the left end of the system. (The opposite would be true for a “right-to-left” system.)

Ideally, the junction box should be located on the wall directly behind the pump motor and

control panel.

A wiring diagram is located in the system’s control panel enclosure. Specific part numbers

and part information can be obtained from the factory by calling

800-444-9624.

Plumbing Requirements

Your unit requires the following plumbing connections:

• 3/4” (19mm) or 1/2” (12 mm) hot and cold water supply lines.

• One wastewater connection (minimum 1 1/2” / 38mm).