Position for make up – Hawk Industries Hawkjaw Jr. Manual 65K-ALS Serial Numbers 4 to 9 User Manual

Page 20

Advertising
background image

1. Stab the drill stand.
2. Center the Suspension Ring (SR) on the

Lateral tilt screw (LTS).

3. If the HawkJaw rests on the rig floor, use

Raise (R) to raise the HawkJaw 1'- 2' ft.
off the rig floor.

4. If the HawkJaw is hooked back to the

derrick, unhook the HawkJaw.

5. Use the Control Handles (CH) to pull the

HawkJaw onto the drill pipe connection.

6. Use Raise (R) and Lower (L) to center the

Top wrench dies (TD) and the Middle
wrench dies (MD) between the shoulder
(S).

7. Keep the Middle wrench dies (MD) away

from the Hard banding (HB).

8. Keep the Top wrench dies (TD) and the

Middle wrench dies (MD) away from the
shoulder (S).

Operation

Continued on next page.

LTS

R

L

CH

TD

MD

HB

S

20

Operation

Position for Make Up

SR

Advertising