Goulds Pumps HT 3196 i-FRAME - IOM User Manual

Page 57

Advertising
background image

This illustration is an example of priming the pump with a foot valve and an outside supply:

1

2

3

4

5

1.

Discharge isolation valve

2.

Shutoff valve

3.

From outside supply

4.

Foot valve

5.

Check valve

This illustration is an example of priming the pump with a foot valve using a bypass around the check
valve:

1

2

3

4

5

1.

By-pass line

2.

Shutoff valve

3.

Foot valve

4.

Check valve

5.

Discharge isolation valve

Commissioning, Startup, Operation, and Shutdown

Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual

55

Advertising