Goulds Pumps HT 3196 i-FRAME - IOM User Manual

Page 81

Advertising
background image

228A

241

370F

370D

423

134

370C

2. Remove the clamp screws (370C) and back off the jam nuts (423).
3. Tighten the jack screws (370D) evenly to move the bearing housing (134) out of the bearing frame

(228A).

4. Remove the shaft assembly from the bearing frame (228A).
5. Remove the jack screws (370D), the nuts (423), and the bearing housing O-ring.
6. Remove the inboard bearing (168A).

122

168A

248A

112A

136

382

253B

7. Remove the bolts (371C), the bearing end cover (109A), and the gasket (360C).
8. Remove the outboard labyrinth oil seal (332A) from the end cover (109A).
9. Remove the O-rings (497F and 497G) if it is necessary.

Labyrinth oil-seal O-rings are part of the 3196 maintenance kits, and they are sold separately.

109A

332A

371C

360C

10. Remove the bearing housing (134) and the bearing (112A) from the shaft (122).

Maintenance

Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual

79

Advertising