Installation, Operation and Maintenance Instruction

Model ICB


ICB 100-English

page 10

Revision 00

Article No 21999991

Issue 05/2006

permitted deviation is 0,2 mm/m. Levelling shims
must be inserted next to the foundation anchors
and must lie plainly.

ƒ If vibrations are transmitted to the foundation from

adjoining components, it must be guarded through
adequate vibration damping paddings (vibrations
from outside can impair the bearing).

ƒ To prevent vibrations being transmitted to

adjoining components, the foundation should be
laid on a suitable insulating base.

The size of these insulating pads will vary,
depending on circumstances, and should
therefore be determined by an experienced
specialist.

5.2 Connection of Pipings to the Pump

The pump must not be used as fixed point for
the piping. The permitted piping loads must not
be exceeded, refer to chapter 3.5.

5.2.1 Suction and discharge pipe
ƒ The pipes must be of a size and design that liquid

can flow freely into the pump and that the pump
functions without problems. Particular attention is
to be paid to ensuring that suction pipes are
airtight and that the NPSH values are observed.
Under suction lift condition lay the suction pipe in
the horizontal section towards the pump so that it
is slightly inclined upwards so that no air traps
occur. Do not install fittings or elbows right before
the suction nozzle.

ƒ If the suction supply is under vacuum and

entrained gas may be present in the liquid, it is
recommended that a vent line (min. diameter 25
mm) be considered upstream of the pump suction
with return to the suction supply, above the max
liquid level.

ƒ An additional flushed piping - discharge branch-

vent line - makes it easier to de-aerate the pump
before start-up (pic 3).























pic 3


ƒ When laying the pipes, make sure that the pump

is accessible for maintenance, installation and
disassembly.

ƒ Notice "Permitted Forces on Flanges" (chapter

3.7).

ƒ If expansion joints are used in the pipes, they

have to be supported in such a way that the pump
is not loaded unduely high because of the
pressure in the pipes.

ƒ Before connecting up to pump: remove protective

coverings from suction and discharge branches.

ƒ Before starting up, the pipe system, fittings and

equipment must be cleaned to remove weld
spatter, scale etc. Any pollutants are to be
completely removed from pump units that are
directly or indirectly connected to drinking water
systems before being installed and taken into use.

ƒ To protect the shaft sealing (especially

mechanical seals) against foreign impurities, it is
recommended that a sieve, 800 micron, is
installed in the suction / intake pipe when the
motor is being started up.

ƒ If the pipe system is tested with the pump

installed, do not exceed the maximum permitted
casing pressure of the pump and/or shaft sealing
(see data sheet).

ƒ When emptying the pipe after the pressure test,

make sure that the pump is treated properly
(danger of rust and problems when starting up).

5.2.2 Additional connections
Any required sealing, flushing or cooling pipe
connections must be installed. Please consult the
data sheet to see which pipes, pressures and
amounts are necessary. The position and size of
connections to the pump are given in the appendix,
"Connections".

These connections are essential for the
function!

It is recommended that a pipeline is installed to take
off any leakage from the shaft seal. For connection,
see appendix, "Connections".

5.3 Drive

Note the Operating Instructions of the motor
manufacturer.

On application in zone 1 and 2 a motor with
valid Atex-certification must be used.

If in the process of the repair a new motor is used ,
the following has to be noticed:
ƒ The motor must comply with the requirements

stated in sheet 1220.1A608 (order from
manufacturer, on demand).

ƒ Clean motor end and motor flange of new motor

carefully (remove varnish).

5.4 Electric Connection

Electrical connection work may only be carried
out by an authorised professional. The rules
and regulations valid for electrical technology,
especially those concerned with safety
measures, must be observed. The regulations
of the national power supply companies
operating in that area must also be observed.

Before starting work, check that the information on the
motor name plate is the same as the local mains