Model icb – Goulds Pumps ICB - IOM User Manual
Page 32
Installation, Operation and Maintenance Instruction
Model ICB
ICB 100-English
page 23
Revision 00
Article No 21999991
Issue 05/2006
Adjust the face on the impeller side of the mech.
seal exactly on measure A. For mech. seals
without own set screws the fixing ring (527)
serves as a stop.
Push mech. seals with bellows in such a way,
that the bellow is compressed and not stretched
(danger of tearing apart!).
Use anti-friction device (Molykote, etc.)
between shaft sleeve and shaft only, if you are
sure that no dangerous reactions between
pumped liquid and anti-friction device can
occur.
Further assembly and installation of pump acc.
chapter 8 of Installation, Operation and
Maintenance Instruction.
Before starting the pump connect flushing
system for quench and put it into operation.