3 notes on installing the pneumatic components – Festo Контроллер крайних положений SPC11 User Manual

Page 17

Advertising
background image

1. Installation instructions for the DGCI or DDLI

1-5

Festo P.BE-SPC11-DGCI-EN en 1406d

1.3

Notes on installing the pneumatic components

Caution
If the operating voltage is switched off while the com-
pressed air supply is still switched on, the actuators may
be triggered, resulting in unexpected movements which
may cause damage. Switch off the operating voltage and
the compressed air supply at the same time or in the fol-
lowing sequence:
1. the compressed air supply
2. the operating voltage

Note
Make sure that the compressed air supply and the operat-
ing voltage are switched off before starting installation and
maintenance work.

General rules for building up the system can be found in the
system manual type P.BE-SPC11-SYS... . Special instructions
on operation with linear unit type DGCI-... can be found in the
following sections:

Note
Observe the following instructions on installing the pneu-
matic components. Only then can you guarantee faultless
operation.

Advertising