5 continuous blower – Bard TCS22-***-003 User Manual

Page 48

Advertising
background image

2100-444-003A

Page 42

Entering the O/R On action will turn on the heater output to unit #1 and it will remain on until

cleared. Entering the O/R Off action will disable the output to the unit #1 heater and it will remain
disabled until cleared. Once overridden the output will remain overridden until the Clr O/R action is sent
to the output or power is interrupted to the controller. Use the Clr O/R to cancel an override action and
resume normal operation.

A supervisor authority level is needed to use this item.

5.3.5.5 CONTINUOUS BLOWER

This item uses the On and Off action items. Overriding the continuous blower item to On causes

the Blower Output to the lead unit to be energized continuously. Overriding the continuous blower item
to Off causes the Blower Output to the lead unit to cycle on and off as there are calls for heating or
cooling.

An operator authority level is needed to use this item.

Advertising