Shipping Damage


Upon receipt of equipment, the carton should be checked for external signs of shipping damage.

If damage is found, the receiving party must contact the carrier immediately, preferably in writing,
requesting inspection by the carrier's agent.

1.2 Package

Contents


1 - TCS22

1 - Outdoor Humidity Sensor

1 - Outdoor Temperature Sensor

1 - TCS22 Operations Manual

1 - TCS Software Package

1.3 Additional

Requirements

This controller is suitable for use with 1 1/2 ton through 6 ton Bard WallMount

air-

conditioners. The Bard WallMount

must be equipped with the "V" control module for proper

operation of the TCS22. Air-conditioner model numbers used with the TCS22 should contain the letter
"V" in the 15th position of the model number.

The TCS22 can be used with or without economizers. If economizers are to be used the units

should be ordered with the “D” vent option. The air-conditioner with economizer used with the TCS22
should contain the letter "D" in the 10th position of the model number.

Additionally, to utilize the Power Failure Management portion of the controller an Inverter and

battery backup system should be installed in the shelter. This provides for ventilation of the structure in
case of utility power failure, alarming of the power failure condition, and acts as an uninterruptible
power supply for the TCS22. See Figure 6.

If the inverter and battery backup system is not used disregard the power failure management

sequence later in this manual.

The power transfer relays shown in Figure 3 are field supplied items and are needed if ventilation

of the structure is required during power outages. The field supplied power transfer relays should be
sized to handle the MCA of the unit being controlled. Single phase units will require a 4 pole contactor
with 2 normally open and 2 normally closed contacts. Three phase units will require either a six pole
contactor or two 3 pole relays with 3 normally closed and three normally open contacts. Square D, D-
Line or F-Line contactors or equivalent are recommended.

If ventilation of the structure is not required during power outages these may be omitted. The

TCS22 will still dial out and alarm the power failure condition although no ventilation will be provided.

1.4 Copyright

Notice


All materials contained in this manual originated from and are the property of Bard

Manufacturing Co. Any reproduction of the text, drawings, or wiring diagrams contained in this manual
is forbidden without the written consent of Bard Manufacturing Co.

Advertising