Installation of the cage nuts into the bracket, Bolting the high level stop lamp to the bracket – ARB 5650010 User Manual

Page 22

Advertising
background image

RE-FITTING THE HI LEVEL BRAKE LAMP TO THE WHEEL CARRIER

8.

INSTALLATION OF THE CAGE
NUTS INTO THE BRACKET

Fit the four M8 cage nuts (long leg) to
the top of the stop lamp bracket using
a small flat bladed screwdriver.

Note:- The body of the cage nut sits on
the underside of the bracket .

Refit the factory high level stop lamp
by aligning the holes in the base of the
lamp with the cage nuts.

Feed the wiring through the hole as
shown .


9.

BOLTING THE HIGH LEVEL STOP
LAMP TO THE BRACKET

Use four black M8 bolts , spring
washers and flat washers fasten the
lamp to the bracket as shown .

Cut the wiring loom in between the
door grommet and the protective
tubing as shown .

The two brake lamp wires will need to
be extended . Solder the wires supplied
in the fitting kit to the factory loom .

Insulate the wires where they are
joined to the original loom .

10 . Partially cover the new wiring with

the convoluted tubing starting at the
new join in the loom .

Run the convoluted tube from the
existing loom along the new section of
cable and using the cable ties
provided , tie the wiring loom back to
the wheel carrier frame as shown .

Leave the ( lamp ) end of the wiring
uncovered ( no tubing ) at this stage .

M8 Cage nuts

(long leg)

Feed wiring through here

Grommet

Plug

New wiring

Cable tie as shown

Existing loom

Last Rev Date: 16/10/2006

Page 22 of 25

3783210 - rev 3

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

Advertising